The water supply of Ciriša (including Ciriša HES water supply, Cirīšu water supply, Lake Pesku) is a water supply built for the use of the hydroelectric power plant in Aglona municipality in Aglona. The flooded lakes (from the west to the east) are Dziļuksnis, Jagodku lake, Piertspakurs, Tūleišu lake, Raudiņu lake and Seksu lake. The hydroelectric power plant was renovated in 2002 with its capacity 1000 kW. The water supply has been placed... Wikipedia